Automated conformance review · Data center design validation software

Every spec, checked.
Every gap, caught.

VeriSpec is automated design review software for data centers. It reads the owner's design specification, reads the bidder's engineering drawings, and checks one against the other — flagging every missed requirement and confirming specification compliance. What takes an engineer 12 hours per discipline, VeriSpec does in minutes.

  • Drawing × spec cross-referencing
  • Discipline-by-discipline coverage
  • Auditable, citable findings
12h → min
Per-discipline review time, collapsed
100%
Of spec line-items checked, every time
6+
Engineering disciplines reviewed in parallel
0missed
Requirements lost to reviewer fatigue
01 — The bottleneck

Manual design review takes days per bid.

When a hyperscaler issues a data center design spec, every bidder submits engineering drawings meant to satisfy it. Someone has to confirm they actually do — line by line, discipline by discipline.

12h

Per discipline, per bid

One engineer manually cross-references a single discipline against the spec. Electrical alone can swallow a full day.

×N

Multiplied by every bidder

Each proposal repeats the same exhaustive read. Reviewer time scales linearly with the size of the field.

And humans get tired

Buried clauses get skimmed. A missed requirement late in review is a costly change order — or a failed build — later.

02 — How it works

Spec in, engineering drawings in, conformance report out.

  1. 01

    Ingest the spec & the set

    Upload the owner's design specification and the bidder's drawing package. VeriSpec parses both into structured, addressable requirements and details.

    spec.pdf · drawings.dwg/pdf → parsed
  2. 02

    Cross-reference each discipline

    For every requirement, VeriSpec locates the corresponding evidence in the drawings and decides: satisfied, missing, or needs review — with a citation back to the source.

    requirement ⇄ drawing evidence
  3. 03

    Return an auditable report

    You get a conformance report: green ticks for what's met, flags for what's missed, each linked to spec clause and drawing location so your engineers verify in minutes, not days.

    report.json · findings + citations
03 — Coverage

Every discipline, reviewed in parallel.

Each discipline that used to be a separate engineer-day is reviewed simultaneously.

Electrical

Redundancy, UPS & generator sizing, coordination, grounding, arc-flash.

Mechanical & Cooling

CRAC/CRAH capacity, redundancy, airflow containment, chilled water.

Structural

Floor loading, seismic, raised-floor & equipment support criteria.

Fire & Life Safety

Detection, suppression, egress, compartmentation per code.

Power Distribution

PDU/RPP layout, busway, capacity headroom, metering.

Telecom & Pathways

Cable routing, tray fill, separation, MMR/MDA provisioning.

04 — The output

A report your engineers can trust and act on.

Electrical 18/19
Mechanical 22/24
Structural 11/11
Fire & Life Safety 14/17
Power Dist. 9/9
Telecom 7/7
SATISFIEDM-2.03

CRAH units provide N+1 redundancy at design day load.

Spec §4.2.1 · Drawing M-201, schedule note 3 · 6×(N=5)+1 confirmed

MISSINGFLS-3.10

Pre-action sprinkler interlock with VESDA detection not shown.

Spec §7.4 requires double-interlock · No corresponding detail located in fire set

REVIEWM-2.14

Chilled water ΔT stated as 10°F; spec targets 12°F.

Spec §4.3.2 · Drawing M-410 note 1 · Confirm impact on pump & pipe sizing

Every finding cites the spec clause and the drawing location — so review becomes verification.

05 — New · Operations

From a verified drawing to automated MOP generation.

The same graph that powers design review also writes the day-2 operating procedures — equipment by equipment, in the right order, aware of what's downstream.

Ask "how do I safely isolate ATS-A?" and VeriSpec reads the facility graph to answer it — not from a generic template, but from this building's topology.

  • 01
    Reads the dependency graph. It knows ATS-A feeds UPS-A → PDU-A → the IT load, and that isolating it drops UPS-A onto battery — so the load must be confirmed safe and available first.
  • 02
    Uses the building's own labels. Equipment is named exactly as the drawing tags it — building XYZ10XYZ10-UPS-A — so steps match what the operator sees in the field.
  • 03
    Adapts per building. Procedures stay consistent by equipment type, but conform to each site's graph — missing equipment, extra redundancy, and switching order are all reflected.
  • 04
    Ordered by the drawing. Steps follow the real source-to-load sequence, with pre-checks, cautions, and lockout / verify built in.
06 — Data residency

Your drawings never leave your servers.

Specs and engineering drawings are some of the most sensitive IP a firm holds. VeriSpec is built to run inside your own environment — your data stays on your infrastructure, under your control, the whole way through review.

  • Complete data residency. Deploy VeriSpec in your VPC or on-prem. Documents are processed where they live and never transit our servers.
  • Your IP stays yours. No training on your data, no retention beyond the review, no third-party sharing — ever.
  • You hold the keys. Run against your own model endpoints and storage, with full audit logs of every access.
Get started

Bring conformance review down to minutes.

We're onboarding a small group of data center engineering & design teams. Tell us about your spec workflow and we'll set up a review on your own documents.

No spam. We'll only reach out about a VeriSpec pilot.